The machinery associated with heaving in and running out anchor chain is the().
A、A.winch
B、B.windlass
C、C.draw works
D、D.dynamic pay out system
A、A.winch
B、B.windlass
C、C.draw works
D、D.dynamic pay out system
A、inside;associated B、inside;not associated C、outside;associated D、outside;not associated
A、The watch keeping personnel B、The chief engineer C、The person on a bunker barge D、Any of the above
A、The watch keeping personnel B、The chief engineer C、The person on a bunker barge D、The duty deck officer
A、A.continue to be responsible for machinery space operations despite the presence of the CE B、B.hand over the responsibility actively C、C.be responsible for the watching together with the chief engineer D、D.assistant the chief engineer to control the machinery
A、the chief engineer B、the engineer on cabin watch C、the bridge officer on watch D、the master
A、Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the spot B、Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the next port of call C、Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired until the next stop D、Any leaks in piping, propeller shaft, machinery, tanks, will have to be at least patched up
A、A.be open to view so,if a foreign object gets in the gearing,the operator can immediately stop the machinery B、B.have a guard over the gearing C、C.be painted a contrasting color from the base color in order to call attention to the gearing D、D.not be operated if there is any crew within 10 feet of the machinery
A、within the space concerned B、outside the space concerned C、the throttle station D、within the fire room