搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.

A、dunnage

B、separation

C、stowage

D、operation

更多“When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.”相关的问题
第4题

A、arranging cargo  B、shipping cargo  C、cargo handling  D、weighing cargo  

点击查看答案
第5题

A、arranging cargo  B、shipping cargo  C、cargo handling  D、weighing cargo  

点击查看答案
第6题

A、The discharge is slow due to the size of the cargo and all the cranes working together  B、The cargo discharge can be accomplished with controlled pendulation  C、The cargo discharge can be performed in port or at anchor  D、The cranes enable the handling of heavy cargos without shoreside assistance  

点击查看答案
第7题

A、the work of using lines and chains to secure the cargo on board  B、the lash work  C、the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching  D、the lashing work  

点击查看答案
第8题

A、arranging for the insurance of goods  B、arranging import customs clearance  C、arranging for transshipment en route if necessary  D、arranging export customs clearance  

点击查看答案
第9题

A、arranging for the insurance of goods  B、arranging import customs clearance  C、arranging for transshipment en route if necessary  D、arranging export customs clearance  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服