搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

If()is shut down for an extended time optimum position fixing will take up to 2 hours after power is reapplied.

A、radar

B、DF

C、Satellite Navigator

D、Automatic Omega Navigator

更多“If()is shut down for an extended time optimum position fixing will take up to 2 hours after power is reapplied.”相关的问题
第1题

A、A. If the SHUTDOWN IMMEDIATE command isissued to the ASM instance, the ASM instance immediately shuts down.  B、B. If the SHUTDOWN ABORT command isissued to the ASM instance, the ASM instance will shutdown all the database instances and then shutdown immediately.  C、C. If the SHUTDOWN NORMAL command isissued to the ASM instance, before shutting down, the ASM instance waits for the dependent database instances to shutdown.  D、D. If the SHUTDOWN TRANSACTIONAL command isissued to the ASM instance, the ASM instance passes the same SHUTDOWN command to the dependent database instances, but does not wait for any active transactions to complete before it shuts down.  

点击查看答案
第2题

A、operated continuously while vapors may be present  B、operated intermittently to remove vapors  C、available on standby for immediate use  D、shut down if an explosive mixture is present  

点击查看答案
第3题

A、Effective even if ventilation is not shut down  B、Will not deteriorate in storage  C、Non-corrosive  D、Effective on electrical equipment  

点击查看答案
第4题

A、The source database backup must be copied over the net for test database.  B、The source database must be run in ARCHIVELOG mode if the database is open.  C、The source database must be shut down cleanly if the database is in mounted state.  D、A net service name should be set up and a listener configured with the target as well as the source database.  

点击查看答案
第5题

A、for which neither party is responsible  B、for which the owner is responsible  C、for which either party is responsible  D、for which the charterer is responsible  

点击查看答案
第6题

A、for which neither party is responsible  B、for which the owner is responsible  C、for which either party is responsible  D、for which the charterer is responsible  

点击查看答案
第7题

A、more sealing water is needed  B、the cover clamp needs tightening  C、the purifier has a bad vibration when started  D、water is discharged from the overflow line  

点击查看答案
第8题

A、Serial 0 is up, line protocol is up  B、Serial 0 is up, line protocol is down  C、Serial 0 is down, line protocol is down  D、Serial 0 is down, line protocol is up  E、Serial 0 is administratively down, line protocol is down  F、Serial 0 is administratively down, line protocol is up  

点击查看答案
第9题

A、go in one direction until the fuel runs out  B、steer a course for the nearest land  C、steer a course for the nearest sea lane  D、shut down the engines if installed and put out the sea anchor  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服