搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().

A、dangerous

B、best

C、bad

D、important

更多“The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().”相关的问题
第1题

A、opposed to the crankshaft rocking couple  B、resonant with the crankshaft natural frequency  C、critical fore and aft crankshaft vibrations  D、horizontal whipping motions of the crankshaft  

点击查看答案
第2题

A、mimimum oxygen content line  B、critical displacement line  C、critical dilution line  D、upper threshold limit  

点击查看答案
第3题

A、minimum oxygen content line  B、critical displacement line  C、critical dilution line  D、upper threshold limit  

点击查看答案
第5题

A、most critical in a four-stroke cycle diesel engine  B、most critical in a two-stroke/cycle diesel engine  C、most critical in a four-stroke/cycle diesel engine if it is turbocharged  D、of equal importance in a two-stroke/cycle diesel engine as in a four-stroke/cycle diesel engine  

点击查看答案
第6题

A、Edit the filter for the Administrative Events view.  B、Create a custom view. Enable theCritical, Error, and Information level events. Select all logs.  C、Create a custom view. Select theCritical checkbox, Error checkbox, and Verbose checkbox. Select all logs.  D、Search for theCritical or Error string by using the Find option of the Administrative Events view.  

点击查看答案
第7题

A、A. Identify which systems are the most critical and bring them up by level of importance.  B、B. Retrieve the latest backup tapes for immediate system restore using the GFS rotation.  C、C. Identify the least critical systems and then power those systems on first.  D、D. Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.  

点击查看答案
第8题

A、From the client computers, run wuauclt.exe /force.  B、From the client computers, run gpupdate.exe /force.  C、From the server, configure the deadline settings.  D、From the server, configure the Synchronization Schedule options.  

点击查看答案
第9题

A、A. Deploy the service pack to a single department within the corporation.  B、B. Upgrade the system with requirements for that service pack.  C、C. Deploy the service pack to a non-critical application server.  D、D. Submit a change control for the service pack deployment.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服