Which step is NOT generally taken when gas-freeing a tank?().
A、Washing the tank interior with sea water
B、Application of degreasing solvents
C、Removal of corrosion products and sludge
D、Fresh air ventilation
A、Washing the tank interior with sea water
B、Application of degreasing solvents
C、Removal of corrosion products and sludge
D、Fresh air ventilation
A、ICM steps B、e-mail steps C、media steps D、database steps
A、The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel. B、The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel. C、The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks. D、The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.
A、7,1,5,2,3,6,4 B、1,5,7,2,3,6;step 4 is not required C、7,1,5,2,3,6;step 4 is not required D、1,2,3,5,6,4;step 7 is not required
A、A. Implement preventative measures. B、B. Close the issue. C、C. Document the outcome. D、D. Question other users to make sure they are not having the same issue
A、7, 1, 5, 2, 3, 6, 4 B、1, 5, 7, 2, 3, 6; step 4 is not required C、7, 1, 5, 2, 3, 6; step 4 is not requiredThis document was downloaded from =>> http://www.amaderforum.com D、1, 2, 3, 5, 6, 4; step 7 is not required
A、A. Identify necessary operating system updates B、B. Implement the change C、C. Document the change D、D. Schedule system down time
A、Create an incident record B、Verify the problem is resolved C、Document the solution D、Notify the user the problem is resolved
A、Reporting requirements B、Diagrams C、Steps to control a discharge D、National and local coordination