搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单项选择题】

If there were fewer management staff, more work ().

A、A.would be done

B、B.will be done

C、C.would have be done

D、D.should be done

更多“If there were fewer management staff, more work ().”相关的问题
第1题

A、there is a minor emergency  B、there is an actual emergency  C、there were a minor emergency  D、there were an actual emergency  

点击查看答案
第2题

A、If no core layer is deployed, the design will be easier to scale.  B、If no core layer is deployed, there will be fewer cabling requirements.  C、If no core layer is deployed, the distribution switches should not be fully meshed.  D、A dedicated campus core layer is not needed for connecting fewer than five buildings.  E、A dedicated campus core layer should be deployed for connecting three or more buildings.  

点击查看答案
第4题

A、Were there loss of energy by friction  B、Since there be loss of energy by friction  C、Were there no loss of energy by friction  D、Should be no loss of energy by friction  

点击查看答案
第5题

A、Compilation fails.  B、The code compiles and the output is 2.  C、If lines 16, 17 and 18 were removed, compilation would fail.  D、If lines 24, 25 and 26 were removed, compilation would fail.  E、If lines 16, 17 and 18 were removed, the code would compile and the output would be 2.  F、If lines 24, 25 and 26 were removed, the code would compile and the output would be 1.  

点击查看答案
第6题

A、close the vent  B、pump out the tank  C、activate the fixed CO2 system  D、cut off the heating coils  

点击查看答案
第7题

A、another  B、others  C、some  D、more  

点击查看答案
第8题

A、another  B、others  C、some  D、more  

点击查看答案
第9题

A、few  B、a few  C、fewer  D、less  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服