搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The port clearance for a ship should be granted()the completion of loading or discharging in the port.

A、before

B、when

C、after

D、during

更多“The port clearance for a ship should be granted()the completion of loading or discharging in the port.”相关的问题
第2题

A、Last Port Clearance  B、Declaration of Crew's Baggages  C、Maritime Declaration of Health  D、List of Bonded Stores  

点击查看答案
第3题

A、The Policy of insurance  B、The Report of Entrance  C、The Clearance  D、The Pratique  

点击查看答案
第4题

A、The Policy of insurance  B、The Report of Entrance  C、The Clearance  D、The Pratique  

点击查看答案
第5题

A、A.The Router1 WAN port is configured as a trunking port.  B、B.The Router1 port connected to Switch1 is configured using subinterfaces.  C、C.The Router1 port connected to Switch1 is configured as 10 Mbps.  D、D.The Switch1 port connected to Router1 is configured as a trunking port.  E、E.The Switch1 port connected to Host B is configured as an access port.  FF.The Switch1 port connected to Hub1 is configured as full duplex.  

点击查看答案
第7题

A、clearance between the top of the valve stem and the rocker arm  B、compression of the valve springs  C、clearance between the valve seat inserts and the head  D、out of roundness of the fuel injection cams  

点击查看答案
第9题

A、Designated port  B、Nonswitch port  C、Switch port  D、Nonroot port  E、Nondesignated port  F、Root port  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服