搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

During cargo operations, your vessel develops a list due to the center of gravity rising above the transverse metacenter. To correct the list, you should().

A、shift weight to the high side

B、shift weight to the centerline

C、add weight in the lower holds or double bottoms

D、remove weight from the lower holds or double bottoms

更多“During cargo operations, your vessel develops a list due to the center of gravity rising above the transverse metacenter. To correct the list, you should().”相关的问题
第1题

A、allow greater than normal loads to be handled by the gear  B、act as an inboard guy in the event the inboard guy parts during cargo handling  C、assist the outboard guy in supporting stresses during cargo handling  D、prevent the inboard guy from parting due to stresses during cargo handling  

点击查看答案
第2题

A、5 times the maximum working pressure on the hose during cargo transfer  B、one half the designed working pressure  C、4 times the pressure of the cargo pump used for transferring  D、5 times the minimum working pressure on the hose during cargo transfer  

点击查看答案
第3题

A、only when the cargo is within its rail  B、after the cargo is checked by tallymen  C、as soon as the cargo loading or unloading begins  D、during the time when loading or unloading is going on  

点击查看答案
第4题

A、to avoid the rearrangement of the cargo loaded on board  B、to ensure the safety of the ship and cargo  C、to reject the damaged cargo during loading operation  D、to prevent the spontaneous combustion of coal and grain  

点击查看答案
第5题

A、to avoid the rearrangement of the cargo loaded on board  B、to ensure the safety of the ship and cargo  C、to reject the damaged cargo during loading operation  D、to prevent the spontaneous combustion of the coal and grain  

点击查看答案
第6题

A、A.shippers who deliver the cargo to the ship on time  B、B.stevedores who handle the cargo with caution  C、C.ship's crew members who check the cargo in regular intervals  D、D.consig ees who take goo care of the cargo  

点击查看答案
第7题

A、after its arrival at the destination  B、during the ship's voyage at sea  C、before they come to the dock  D、during the time when the loading or diacharging is going on  

点击查看答案
第8题

A、only when the cargo is within its rail  B、during the time when loading or unloading is going on  C、after the cargo is checked by tallymen  D、as soon as loading or discharging begins  

点击查看答案
第9题

A、only when the cargo is within its rail  B、during the time when loading or ynloading is going on  C、after the cargo is checked by tallymen  D、as soon as loading or discharging begins  

点击查看答案
第10题

A、Do not exceed rated load capacity of crane and container spreader or slings  B、During any cargo handling operation,the safety of personnel is paramount  C、Cargo handlers must be outfitted with adequate protection from personal injury  D、All the above  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服