搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单项选择题】

After has permit the commissioning, the()will permit the SES access to system.

A、A.INMARSAT

B、B.IMO

C、C.MSC

D、D.CES

更多“After has permit the commissioning, the()will permit the SES access to system.”相关的问题
第1题

A、Network  B、The CES preferred by the applicant  C、INMARSAT  D、The SES itself  

点击查看答案
第2题

A、A. Warm air flow is permitted through the front bezel  B、B. The system is labeled so that it can be identified  C、C. Verify the change control process can be implemented  D、D. Determine the correct power requirements  

点击查看答案
第3题

A、A.after the mooring trial has passed  B、B.before the mooring trial  C、C.under the surveyors supervision  D、D.after repair  

点击查看答案
第6题

A、when the boiler has been secured long enough for most solids to settle  B、when the boiler has been cooled to ambient temperature  C、only after raising the water level to within 0~5 inch of the high water cutout only  D、after bypassing the low pressure  

点击查看答案
第7题

A、After an unsuccessful reboot  B、If a user’s IP address has been spoofed  C、After using IPCONFIG /RELEASE  D、If the computer has an ARP address conflict  

点击查看答案
第8题

A、ip prefix - list fred permit 10.0.0.0/24 ge 16 le 28  B、ip prefix - list barney permit 10.0.0.0/24 le 28  C、ip prefix - list wilma permit 10.0.0.0/24 ge 25  D、ip prefix - list betty permit 10.0.0.0/24 ge 28  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服