On the cargo manifest,the gross weight of a box containing cargo is the weight of the().
A、cargo
B、box
C、cargo and box
D、rate weight
A、cargo
B、box
C、cargo and box
D、rate weight
A、A.Put all the remaining cargo on starboard side B、B.Put light cargo on starboardside and heavy cargo on port side C、C.Put light cargo on port side and heavy cargo on starboard side D、D.A,B,C are all correct
A、Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holds B、Turn on ventilation for cargo holds,raise/open the stern door,lower the stern ramp C、Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern door D、Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds
A、placing bunker on the deck B、building a stage on which to place the cargo C、welding steel feet to the deck, on which the cargo is placed D、erecting vertical pillars under the deck to support the cargo
A、A.placing bunker on the deck B、B.building a stage on which to place the cargo C、C.welding steel feet to the deck,on which the cargo is placed D、D.erecting vertical pillars under the deck to support the cargo
A、increases as the cargo closes the head while hoisting B、increases if the cargo runner is doubled up C、decreases as the boom is topped to a greater angle D、is determined by the thrust stresses on the boom
A、the cargo is loading B、the cargo is discharged C、the cargo is on board D、the cargo is damaged
A、5 times the maximum working pressure on the hose during cargo transfer B、one half the designed working pressure C、4 times the pressure of the cargo pump used for transferring D、5 times the minimum working pressure on the hose during cargo transfer
A、A.stow the hazardous cargoes on deck available for jettisoning if necessary B、B.remove the hazardous cargo labels from a portable tank after the tank is emptied C、C.have the shipping papers indicate the proper shipping name and the technical name of n.o.s. cargoes D、D.log the receipt of hazardous cargoes in the Official Logbook
A、A.calculating the ullage in the cargo tanks B、B.loading ballast by gravity C、C.the loading of new cargo into the slop tank as a procedure to minimize pollution D、D.calculating the ratio of cargo expansion in a cargo tank