Those lashing tools must be tightened again before and after bad weather.()
A、恶劣天气来之前,必须重新上紧这些绑扎工具。
B、恶劣天气过后,必须重新上紧这些绑扎工具。
C、恶劣天气前后,必须重新上紧这些绑扎工具。
D、恶劣天气前后,这些货物要重新固扎。
A、恶劣天气来之前,必须重新上紧这些绑扎工具。
B、恶劣天气过后,必须重新上紧这些绑扎工具。
C、恶劣天气前后,必须重新上紧这些绑扎工具。
D、恶劣天气前后,这些货物要重新固扎。
A、Lashing bars, twist locks, bridge plates and bridge fittings are tools used for lashing containers. B、Twist locks, bridge plates, bridge fittings and lashing bars are tools used for lashing containers. C、Twist locks, lashing bars, bridge fittings and bridge plates are tools used for lashing containers. D、Lashing bars, bridge fittings, bridge plates and twist locks are tools used for lashing containers.
A、Different lashing tools should be used separately. B、Different lashing tools should be stowed separately. C、Different lashing wires should be stowed separately. D、Different lashing bars should be stowed separately.
A、These lashing tools must be tightened again. B、These lashing wires must be tightened again. C、These lashing bars must be secured again. D、These cargo wires must be loosened again.
A、Stack weights should be less when using a solid bar lashing as compared to a wire lashing B、Stack heights may be increased when using a solid bar lashing C、Stack heights should be reduced when using a solid bar lashing D、Solid bars should be used for lashing the first tier only,with wire lashings on the higher tier(s)
A、Periodic inspection and retensioning of lashings as required during voyage B、Lashings may be completed after the vessel leaves port C、One QMED assigned to oversee the initial loading and lashing D、All of the above
A、a wooden bin is constructed of at least 2-inch dunnage and bolted together B、the cargo is lashed to the adjacent guard rails C、the lashings are secured to deck pad eyes D、there is at least 3 inches of dunnage on deck