搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

During bunkering, the request for stoppage of pumping shall be made, as a rule, 5 minutes ().

A、ago

B、before

C、ahead

D、front

更多“During bunkering, the request for stoppage of pumping shall be made, as a rule, 5 minutes ().”相关的问题
第1题

A、Bunkering  B、High winds  C、Potable water spill on deck  

点击查看答案
第4题

A、expansion space to leave in a tank  B、flash point at which the fuel will burn  C、temperature to which the fuel must be heated  D、rate at which the fuel can be pumped during transfer operations  

点击查看答案
第5题

A、expansion space to leave in a tank  B、flash point at which the fuel will burn  C、temperature to which the fuel must be heated  D、rate at which the fuel can be pumped during transfer operations  

点击查看答案
第6题

A、Bunkering barge alongside  B、Potable water spill on deck  C、Crane hydraulic hose bursts  D、Trim greater than 4 feet  

点击查看答案
第7题

A、All scuppers plugged by carpenter  B、Tanks sounded from time to time  C、Watch kept for leakage  D、Take oil samples  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服