搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Before the final examination, some students have shown()of tension. They even have trouble in sleeping.

A、anxiety

B、marks

C、signs

D、remarks

更多“Before the final examination, some students have shown()of tension. They even have trouble in sleeping.”相关的问题
第1题

A、to their final position with the winch operating at slow speed  B、to the bar stop,and then hand cranked to their final position  C、until just before they make contact with the limit switch,and then hand cranked to their final position  D、to the embarkation deck,and then hand cranked to their final position  

点击查看答案
第2题

A、one month before the anniversary date of the plan  B、six months before the end of the approval period  C、and cannot be implemented without approval  D、and can be implemented without immediate approval as long as final approval is received within six months of submission  

点击查看答案
第3题

A、stop the winch just before the craft reaches the final stowage position  B、limit the amount of cable on the drum  C、limit the ascent rate  D、stop the winch in case the craft weighs too much  

点击查看答案
第4题

A、A finalizer may NOT be invoked explicitly.  B、The finalize method declared in class Object takes no action.  C、super.finalize()is called implicitly by any over riding finalize method.  D、The finalize method for a given objec twill be called no more than once by the garbage collector.  E、The order in which finalize will be called on two objects is based on the order in which the two objects became finalizable.  

点击查看答案
第5题

A、the final judge of the reliance the mariner can place on the information given  B、its immediate importance cannot always be verified before promulgation  C、through imperfections in the survey on which it is based,or subsequent alterations to the topography or sea floor  D、deferring the promulgation of certain less important information  

点击查看答案
第6题

A、Explore the ramification of the change before implementation.  B、Determine the service level agreement in place before implementation.  C、Review the equipment disposal procedures and policies before implementation.  D、Notify all staff members of the planned system outage before implementation.  

点击查看答案
第7题

A、Use handlers for a tunneling routed event and mark the event as handled in the case of a problem.  B、Use handlers for a tunneling routed event and make the event as handled in the finally portion of a try-catch-finally code block.  C、Use handlers for a bubbling routed event and mark the event as handled in the case of a problem.  D、Use handlers for a bubbling routed event and set the Handled property of the RoutedEventArgs object to true in the catch portion of a try-catch-finally code block.  

点击查看答案
第8题

A、null  B、finally  C、null finally  D、Compilation fails.  E、finally exception  

点击查看答案
第9题

A、null  B、finally  C、null finally  D、Compilation fails.  E、finally exception  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服